The work to install the fire hydrant at the corner of Highland Street and 13th Street will begin on Friday, August 20th. The work should only take a couple of days.



Extra Work Being Performed this Week
August 12, 2010, 2:39 pm
Filed under: Construction Updates
Extra work being performed this week:

1) The completion of (2) 4″ conduits for Comcast and (2) 4″ conduits for Verizon. This will require about 18 lineal feet of trenching in the street on the West side of Hancock Street.

b) The installation of (1) 2″ conduit beginning at the same pole that the 4″ conduit stub is at, crossing Hancock, then across the county portion of the small island, across Highland and stopping at the pole on the East side of Highland.